Case study
Mekong Power: four days of argument about ninety seconds.
Three plants, three clocks that disagreed by up to nine seconds, and an outage report nobody would sign.
- Power generation
- 3 plants
- 5 months to cutover
- Live since June 2025
- Client
- Mekong Power
- Sector
- Power generation
- Sites
- 3 plants
- Duration
- 5 months to cutover
01The problem
Every unplanned outage started a four-day argument. The turbine historian, the grid operator log and the shift book each told a different story about the same ninety seconds, and attribution was settled by whichever account had the most senior person behind it.
02What we did
One time base. Each source is ingested with its original timestamp and its measured clock offset recorded alongside, so a sequence of events is rebuilt from records rather than reconstructed from memory. Attribution runs as a report against signed data, not as a meeting.
03What changed
An outage report is produced before the shift ends, from records the grid operator can read directly. The four-day argument no longer has anything left to argue about.
Case studies
What changed, measured the way the plant measures it.
Every figure below was taken from the client’s own reporting, not ours, and published with their sign-off.
Đông Hải Steel
Steel & metals · 6 sites
Eleven years of unprovable process data turned into accepted regulatory evidence in six months.
−94%
Supplementary evidence requests
Mekong Power
Power generation · 3 plants
Unplanned outage attribution cut from four days of argument to a report generated before the shift ends.
4d → 40m
Time to attribute an outage
Bình Minh Plastics
Chemicals · 9 lines
Batch genealogy assembled automatically, turning a three-week recall simulation into a same-day exercise.
21d → 6h
Recall trace time
Hanoi Water
Water utilities · 18 stations
Regulatory submissions assembled from signed source records rather than re-keyed spreadsheets.
100%
Submissions accepted first pass