ISO 27001 · SOC 2 Type II · CMMI Level 3

+84 28 3822 9100

Critical infrastructure software

The control layer for plants that cannot afford downtime.

Northbound replaces the spreadsheets, PLC exports and vendor portals that fragment industrial operations with one governed system of record — deployed inside your network, audited end to end.

Deployed across 240 production sites in 14 countries.

Deployment profile

Runtime
On-prem / air-gapped
Failover
Active–active, 12s RTO
Protocols
OPC UA · Modbus · MQTT
Retention
10 years, immutable
Assurance
SOC 2 Type II

Every write is signed, versioned and replayable.

99.98%
Platform availabilityRolling 24 months
240
Production sites14 countries
12s
Failover recoveryMeasured, not modelled
4.1B
Signals ingested dailyPeak 92k/sec

Capabilities

Three systems most plants run separately. One system of record.

Northbound is not a dashboard bolted onto your historian. It owns the data contract between the floor, the planners and the auditors.

Unified historian

Every tag, batch and exception in one immutable store with a ten-year retention floor and no vendor lock on export.

  • OPC UA & Modbus ingest
  • Schema versioning
  • Point-in-time replay

Operations orchestration

Work orders, changeovers and maintenance windows scheduled against live constraints instead of last week’s plan.

  • Constraint solver
  • Shift handover
  • Downtime attribution

Compliance evidence

Audit packs assemble themselves. Inspectors get signed, tamper-evident records rather than a folder of exports.

  • Signed write log
  • 21 CFR Part 11
  • Automated audit packs

Method

A deployment path that survives contact with a live plant.

  1. 01Weeks 1–3

    Signal survey

    We map every tag, gateway and manual log across two representative sites before a single line is written.

  2. 02Weeks 4–9

    Shadow run

    Northbound ingests in parallel with your existing historian. Nothing is cut over while the deltas are reconciled.

  3. 03Weeks 10–16

    Controlled cutover

    Line by line, with rollback held open for a full production cycle and your engineers holding the switch.

  4. 04Week 17+

    Handover

    Runbooks, on-call rotation and an assurance pack your auditors accept. We stay on retainer, not on life support.

Clients

  • VINACHEM
  • Đông Hải Steel
  • Mekong Power
  • Trường Sơn Cement
  • BÌNH MINH Plastics
  • Hanoi Water
We had eleven years of process data we could not legally prove was unaltered. Six months after cutover, our regulator stopped asking for supplementary evidence entirely.

Phạm Quốc Hưng

Director of Operations, Đông Hải Steel

Bring us your hardest site.

A briefing runs ninety minutes with your operations and IT leads in the room. You leave with a signal survey scope and a fixed-price number — no pilot fee, no procurement theatre.