Why we will not quote before walking the floor

A fixed price derived from a requirements document is a guess with a signature on it. What the survey is actually for.

ĐKTrần Đình KhoaManaging director

2 July 20265 min

We are asked roughly once a month to price an integration from a specification. We decline, and it costs us work. The reason is that the specification describes the system somebody intended, and we will be paid to connect the one that exists.

What the document never says

That two of the six historians are the same product at different versions with incompatible tag naming. That the line nobody mentioned has its own PLC and its own engineer. That the export everyone relies on is a scheduled task on a workstation under a desk, and the person who wrote it left in 2019.

Fifteen days

So we survey first: fifteen working days, fixed price, two of your hardest sites. You keep everything it produces whether or not you engage us afterwards, because a map of your own signals is worth having regardless of who draws it.

A quote after that is a number we can hold. A quote before it is a number we would have to renegotiate, which serves nobody.

  • Practice
  • Estimation
  • Survey

Bring us your hardest site.

A briefing runs ninety minutes with your operations and IT leads in the room. You leave with a signal survey scope and a fixed-price number — no pilot fee, no procurement theatre.